DRAFT
TM 5-4210-249-13&P-4
0606
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00970
NOTE
Perform Steps (31) through (54) to install heat trace cable to terminal in junction box.
Allow approximately 24 in. (610 mm) of heat trace cable for installation in junction box.
32. Cut off end of heat trace cable (10) at 45 degrees.
33. Push 12 to 18 in. (30 to 457 mm) of heat trace cable (10) through bottom of junction box (4).
34. Cut off end of heat trace cable (10) at 90 degrees to square off cable.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0606-12