• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PIPING HEAT TRACE REPLACEMENT - Continued
PIPING HEAT TRACE REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 4 Page Navigation
  239    240    241    242    243  244  245    246    247    248    249  
img
DRAFT
TM 5-4210-249-13&P-4
0606
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00970
NOTE
Perform Steps (31) through (54) to install heat trace cable to terminal in junction box.
Allow approximately 24 in. (610 mm) of heat trace cable for installation in junction box.
32. Cut off end of heat trace cable (10) at 45 degrees.
33. Push 12 to 18 in. (30 to 457 mm) of heat trace cable (10) through bottom of junction box (4).
34. Cut off end of heat trace cable (10) at 90 degrees to square off cable.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0606-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.