• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PIPING HEAT TRACE REPLACEMENT - Continued
PIPING HEAT TRACE REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 4 Page Navigation
  236    237    238    239    240  241  242    243    244    245    246  
img
DRAFT
TM 5-4210-249-13&P-4
0606
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00966
CAUTION
Do not cut braid when scoring outer jacket. Damage to heat trace cable may occur
if braid is cut.
11. Lightly score outer jacket (34) with utility knife 4 in. (101.6 mm) from end of heat trace cable (10).
12. Bend heat trace cable (10) to break outer jacket (34) at score.
13. Push heat trace braid (7) back toward outer jacket (34) to create a pucker.
14. Open heat trace braid (7) at pucker using screwdriver.
15. Bend heat trace cable (10) and work it through opening in heat trace braid (7).
CAUTION
Do not cut wires. Damage to heat trace cable may occur.
16. Pull heat trace braid (7) tight to make a pigtail.
0606-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.