DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
PUMP HOUSE PANELS REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's: Automotive
MOS 63B Wheeled vehicle mechanic (2)
(WP 0622, Item 27)
References
Materials/Parts
WP 0220
Compound, Sealing, Pipe Thread
WP 0241
(WP 0625, Item 21)
Mineral Spirits (WP 0625, Item 32)
Tags, Identification (WP 0625, Item 51)
Locknut (2)
Locknut (5)
WP 0615, Fig. 125
Locknut (1)
Equipment Conditions
Locknut (4)
Batteries disconnected (TM 9-2320-325-14&P)
Locknut (16)
Wheels chocked (TM 9-2320-347-10)
Lockwasher (91)
Lockwasher (82)
Lockwasher (12)
Lockwasher (6)
GENERAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Table 1.
Pump House Panels Locations.
Location
Panels
Driver side
A through E
Front
F through I
Passenger side
J through N
Back
O through R
Top
S through U