• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP HOUSE ACCESS DOORS REPLACEMENT - Continued
PUMP HOUSE PANEL A OPEN/CLOSE

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  1151    1152    1153    1154    1155  1156  1157    1158    1159    1160    1161  
img
DRAFT
TM 5-4210-249-13&P-3
0538
INSTALLATION
1.
Install seal (12) on pump access door (1).
2.
Install spring (11) in place by bending two tabs (10).
3.
Secure spring (11) in place by bending two tabs (10).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00145
4.
Install hinge (5) on pump house access door (1) with two screws (9), washers (8), and locknuts (7).
5.
Install hinge (5) on pump panel (6) with two screws (4), washers (3), and locknuts (2).
6.
Close pump house access door (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0538-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.