DRAFT
TM 5-4210-249-13&P-3
0490
NOTE
The following Steps may be necessary to access and replace priming system:
1.
2.
3.
Pump Operator's Panel Housing Open/Close (WP 0325)
4.
Piping Assembly (pipe thread sealing compound) (WP 0489)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Table 8.
Priming System.
Item No.
Description
1
Main Inlet Weldment
2
Tubing
3
Tubing
4
Hose
5
Tubing
6
Hose
7
Tubing
8
Tubing
9
Main Inlet Tee Weldment
10
Main Inlet Weldment
11
Cap/Adapter
12
After Main Intake Relief/Dump Valve Weldment
13
Drain Hose
14
Hose Adapter
15
Hose
16
Hose
END OF TASK
END OF WORK PACKAGE