• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GROUND SWEEPS AND THERMAL RELIEF SYSTEMS
WINDSHIELD DELUGE SYSTEM

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  912    913    914    915    916  917  918    919    920    921    922  
img
. . . .
DRAFT
TM 5-4210-249-13&P-3
0490
NOTE
The following Steps may be necessary to access and replace ground sweeps and thermal
relief systems:
1.
Pump House Panel A Open/Close (WP 0539)
2.
Pump House Panels Replacement (WP 0540)
3.
Piping Assembly (pipe thread sealing compound) (WP 0489)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Table 6.
Ground Sweeps and Thermal Relief Systems.
Item No.
Description
1
Foam, Water Tank, Thermal Relief, and Ground Sweeps Weldment
2
Tubing (Drain)
3
Ground Sweeps Weldment
4
Hose
5
Hose
6
Hose
7
Hose
8
Hose
9
Hose
10
Hose
11
Hose
END OF TASK
0490-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.