DRAFT
TM 5-4210-249-13&P-3
0490
NOTE
The following Steps may be necessary to access and replace ground sweeps and thermal
relief systems:
1.
2.
3.
Piping Assembly (pipe thread sealing compound) (WP 0489)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Table 6.
Ground Sweeps and Thermal Relief Systems.
Item No.
Description
1
Foam, Water Tank, Thermal Relief, and Ground Sweeps Weldment
2
Tubing (Drain)
3
Ground Sweeps Weldment
4
Hose
5
Hose
6
Hose
7
Hose
8
Hose
9
Hose
10
Hose
11
Hose
END OF TASK