• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP OPERATOR'S PANEL HOURMETER REPLACEMENT
PUMP OPERATOR'S PANEL HOUSING OPEN/CLOSE

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  117    118    119    120    121  122  123    124    125    126    127  
img
.
DRAFT
TM 5-4210-249-13&P-3
0324
INSTALLATION
TFFT00680
1.
Install hour meter (3) on pump operator's panel (7) with bracket (6) and two screws (5).
2.
Install two wires (4) on hour meter (3).
3.
Install two wires (2) on hour meter (3) with two nuts (1).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
WARNING
ICON 30, 44, 27
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful
vapors, and are harmful to skin and clothing. To avoid injury or death, keep away
from open fire and use in well-ventilated area. If adhesive, solvent, or sealing
compound gets on skin or clothing, wash immediately with soap and water.
4.
Apply electrical sealant to ends of two wires (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0324-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.