DRAFT
TM 5-4210-249-13&P-3
0325
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT0358
3.
Install manual metering valve handle (2) on manual foam valve (3) with two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Close pump operator's panel cover (WP 0019)
END OF TASK
END OF WORK PACKAGE
0325-3/(4 blank)