• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL VALVE BODY - Continued
LOCKUP CUTOFF VALVE BODY

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  373    374    375    376    377  378  379    380    381    382    383  
img
. . . .
TM 5-4210-233-14&P-2
6-63. MODULATOR VALVE
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Transmission Oil Drained (see para 4-142.)
(Appendix B, Section III, Item 1)
MATERIALS/PARTS REQUIRED
Tags, Identification (Item 32, Appendix E)
Preformed Packing (Figure 131, Appendix F)
a. Removal.
NOTE
Tag (Item 32, Appendix E) and mark hose before disconnecting.
(1)
Disconnect hose (1) from modulatorvalve (2).
(2)
Remove screw (3), bracket (4), modulator valve (2), preformed packing (5), and pin (6). Discard
preformed packing.
b. Installation.
(1)
Install pin (6), new preformed packing (5), modulator valve (2), bracket (4), and screw (3).
(2)
Tighten screw (3) to 8 to 10 Ib-ft (11 to 14 N-m).
(3)
Connect hose (1) to modulator valve (2).
c. Follow-on Maintenance.
(1)
Refill Transmission with oil (see para 4-142).
6-380


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.