TM 5-4210-233-14&P-2
6-62. CONTROL VALVE BODY - Continued
(16)
Install three-our shift valve (43), modulator valve (44), valve spring (45), valve stop (46), and
adjusting ring (47).
(17)
Align pinhole in valve stop (46) with pinholes in control valve body (1).
(18)
Press adjusting ring (47) and install retaining pin (48) in control valve body (1).
(19)
Install two-three shift valve (49), two-three modulator valve (50), valve spring (51), valve stop (52),
and adjusting ring (53).
(20)
Align pinhole in valve stop (52) with pinholes in control valve body (1).
(21)
Press adjusting ring (53) and install retaining pin (54) in control valve body (1).
6-375