TM 5-4210-233-14&P-2
6-13. CYLINDER HEAD REMOVAL/INSTALLATION
THIS TASK COVERS:
a. Removal
c. Installation
b. Cleaning and Inspection
d. Follow-on Maintenance
TOOLS REQUIRED
MATERIALS/PARTS REQUIRED
Tool Kit, General Mechanics, Automotive
Shop Equipment, Automotive
Maintenance and Repair
EQUIPMENT CONDITION
Engine Cooling System Drained (see para 5-31.)
Air Cleaner Air Hoses Removed (see para 4-128.)
Stud, guide, cylinder head
Thermostat Housings Removed (see para 4-137.)
Rocker Covers Removed (see para 4-140.)
Wrench, fuel line nut (Appendix B, Section III, Item 24)
a. Removal.
NOTE
Left and right banks are different. Left bank has three
screws. Right bank has only two screws. Bracket shown
being removed from left bank.
(1)
Remove two screws (1), lockwashers (2), and washers (3).
(2)
Remove screw (4), lockwasher (5), and bracket (6).
6-77