• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR BOX COVERS - Continued
AIR BOX DRAINS - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  67    68    69    70    71  72  73    74    75    76    77  
img
. . . .
TM 5-4210-233-14&P-2
6-12. AIR BOX DRAINS
THIS TASK COVERS:
a. Removal
c. Testing Air Flow
b. Installation
TOOLS REQUIRED
MATERIALS/PARTS REQUIRED
Tool Kit, General Mechanics, Automotive
Compound, sealing, pipe thread
(Appendix B, Section III, Item 1)
(Item 2, Appendix E)
Shop Equipment, Automotive
EQUIPMENT CONDITION
Maintenance and Repair
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 4)
APU Shutdown (see para 2-16.)
Batteries disconnected (see para 4-114.)
Air pressure gauge, O to 30 psi (O to 21 0 kPa)
(Appendix B, Section III, Item 21)
a. Removal.
NOTE
Right and left air box drains are removed the same way.
(1)
Remove screw (1), and lockwasher (2), and
washer (3).
(2)
Remove fitting (4) and hose (5) from check
valve (6).
(3)
Remove clamp (7).
(4)
Remove check valve (6) from tee (8).
6-74


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.