TM 5-4210-233-14&P-2
6-6. FIRE PUMP
This task covers:
a.
Removal of Transmission
g.
Disassembly of Pump Body
b.
Disassembly of Transmission
h.
Inspection of Pump Body
c.
Inspection of Transmission
i
Assembly of Pump Body
d.
Assembly of Transmission
j.
Installation of Pump
e.
Installation of Transmission
k.
Packing Adjustment/Replacement
f.
Removal of Complete
I.
Follow-on Maintenance
Pump Body
m.
Testing
TOOLS REQUIRED
MATERIALS/PARTS REQUIRED- Continued
Tool Kit, General Mechanics, Automotive
MATERIALS/PARTS REQUIRED
PERSONNEL REQUIRED: 2
EQUIPMENT CONDITION
Main Engine Shutdown (see para 2-12.)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
Curb Side Operators Panel Removed
(see para 4-26.)
Street Side Operators Panel Removed
(see para 4-25.)
Drive Shafts Removed (see para 5-7.)
a. Removal of Transmission.
(1)
Remove cotter pins (82 and 83), hex
nuts (84 and 85), and flatwashers (86
and 87) to remove drive shaft end
yokes. (See illustration on page 6-15.)
(2)
Remove coppertube (1) from auxiliary
cooler (2).
(3)
Remove two clamps (3) from auxiliary
cooler. Move cooler aside to allow for
pump removal.
6-11