DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
NO. 1 DISCHARGE VALVE (DRIVER SIDE) REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0047
(WP 0622, Item 27)
Materials/Parts
WP 0615, Fig. 113
Compound, Sealing, Pipe Thread
Equipment Conditions
(WP 0625, Item 21)
Ties, Cable, Plastic (WP 0625, Item 58)
Front pump house panels, A, D, E, and I removed
Locknut (2)
Lockwasher (2)
Locknut (2)
Personnel Required
MOS 63B Wheeled vehicle mechanic (2)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0485-1