DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
POWER DISTRIBUTION BOX CONTROL PANEL (PUMP HOUSE) REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanic's: Automotive
(WP 0622, Item 27)
Materials/Parts
Terminal block (pass-through)
Lockwasher (1)
Lockwasher (1)
Dual governor pressure switch
References
WP 0615, Fig. 83
REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02563
NOTE
Note position of connectors before removal to ensure proper installation.
1.
Disconnect main wire harness connector (1) from power distribution panel connector (2).
2.
Disconnect pump panel wire harness connector (3) from power distribution panel connector (4).
3.
Remove nut (5), lockwasher (6), and power distribution panel connector (2) from power distribution box (7).
Discard lockwasher.
4.
Remove nut (8), lockwasher (9), and power distribution panel connector (4) from power distribution box (7).
Discard lockwasher.
0408-1