DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
POWER CABLE ASSEMBLY (SINCGARS) REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0615, Fig. 59
(WP 0622, Item 27)
Equipment Conditions
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Lockwasher (1)
Lockwasher (1)
REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02596
NOTE
Tag and mark wires prior to removal to ensure proper installation.
Note routing of power cable assembly prior to removal to ensure proper installation.
Remove cable ties and cushion clips as required.
1.
Remove nut (1), lockwasher (2), washer (3), and T1 connector (4) from power terminal (5). Discard
lockwasher.
2.
Remove nut (6), lockwasher (7), washer (8), and T2 connector (9) from ground terminal (10). Discard
lockwasher.
0409-1