DRAFT
TM 5-4210-249-13&P-3
0408
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02563
NOTE
Install connectors as noted prior to removal.
2.
Install power distribution panel connector (4) on power distribution box (7) with lockwasher (9) and nut (8).
3.
Install power distribution panel connector (2) on power distribution box (7) with lockwasher (6) and nut (5).
4.
Connect pump panel wire harness connector (3) to power distribution panel connector (4).
5.
Connect main wire harness connector (1) to power distribution panel connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install dual governor pressure switch (WP 0386)
2.
Install terminal block (pass-through) (WP 0429)
3.
4.
5.
END OF TASK
END OF WORK PACKAGE
0408-3/(4 blank)