• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER DISTRIBUTION BOX (PUMP HOUSE) REPLACEMENT
POWER DISTRIBUTION BOX CONTROL PANEL (PUMP HOUSE) REPLACEMENT

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  385    386    387    388    389  390  391    392    393    394    395  
img
. . . . . .
DRAFT
TM 5-4210-249-13&P-3
0407
INSTALLATION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT2522
Install power distribution box (5) on bracket (6) with four screws (4), eight washers (3), four lockwashers (2), and
nuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install dual governor pressure switch (WP 0392)
2.
Install terminal block (pass-through) (WP 0429)
3.
Install power distribution box control panel (pump house) (WP 0408)
4.
Install auto fill control (WP 0363)
5.
Install preheat breaker (WP 0391)
6.
Install pump house panel S (WP 0540)
END OF TASK
END OF WORK PACKAGE
0407-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.