TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
PUMP OPERATOR'S PANEL TWO-POSITION TOGGLE SWITCH REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0615, Fig. 56
(WP 0622, Item 27)
Equipment Conditions
Materials/Parts
Batteries disconnected (TM 9-2320-325-14&P)
Adhesive, RTV 732 (WP 0625, Item 2)
Pump operator's panel housing
Tags, Identification (WP 0625, Item 51)
REMOVAL
TFFT00422
NOTE
Water tank drain and foam flush two-position toggle switches are removed the same way.
Water tank drain two-position toggle switch shown.
Foam flush two-position toggle switch is equipped with three wires.
Tag and mark wires prior to removal to ensure proper installation.
1.
Remove two screws (1) and wires (2) from two-position toggle switch (3).
NOTE
Note orientation of two-position toggle switch prior to removal to ensure proper installation.
2.
Remove nut (4), washer (5), and two-position toggle switch (3) from pump operator's panel (6).
END OF TASK
0338-1