DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
PUMP OPERATOR'S PANEL WATER LEVEL GAUGE REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0615, Fig. 56
(WP 0622, Item 27)
Equipment Conditions
Materials/Parts
Batteries disconnected (TM 9-2320-325-14&P)
Tags, Identification (WP 0625, Item 51)
Pump operator's panel housing opened
Ties, Cable, Plastic (WP 0625, Item 58)
REMOVAL
TFFT00599
NOTE
Tag and mark connectors and wires prior to removal to ensure proper installation.
Remove cable ties as required.
1.
Disconnect three connectors (1).
2.
Cut two wires (2) (TM 9-2320-325-14&P).
3.
Remove four screws (3) and water level gauge (4) from pump operator's panel (5).
END OF TASK
0339-1