DRAFT
TM 5-4210-249-13&P-3
0338
INSTALLATION
TFFT00422
NOTE
Install two-position toggle switch and wires as noted prior to removal.
1.
Install two-position toggle switch (3) on pump operator's panel (6) with washer (5) and nut (4).
2.
Install two wires (2) on two-position toggle switch (3) with two screws (1).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
WARNING
ICON 30, 44, 27
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful
vapors, and are harmful to skin and clothing. To avoid injury or death, keep away
from open fire and use in well-ventilated area. If adhesive, solvent, or sealing
compound gets on skin or clothing, wash immediately with soap and water.
3.
Apply electrical sealant to ends of two wires (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0338-2