DRAFT
TM 5-4210-249-13&P-2
FIELD LEVEL MAINTENANCE
PRIMER PUMP REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Materials/Parts (continued)
Tool Kit, General Mechanic's: Automotive
Locknut (1)
(WP 0622, Item 27)
Locknut (1)
Locknut (4)
Materials/Parts
References
Compound, Sealing, Pipe Tread
(WP 0625, Item 21)
WP 0615, Fig. 39
Tags, Identification (WP 0625, Item 51)
Equipment Conditions
Ties, Cable, Plastic (WP 0625, Item 58)
Water pump engine OFF (WP 0022)
Locknut (1)
Batteries disconnected (TM 9-2320-325-14&P)
Locknut (1)
Water system drained (WP 0041)
REMOVAL
TFFT00280
NOTE
Tag and mark hoses and wires prior to removal to ensure proper installation.
Remove cable ties as required.
1.
Remove elbow (1) from fitting (2).
2.
Remove supply line (3) from elbow (4).
3.
Loosen clamp (5) and remove hose (6) from primer pump (7) and vehicle.
4.
Remove locknut (8) and wire (9) from stud (10). Discard locknut.
0262-1