DRAFT
TM 5-4210-249-13&P-2
0259
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00154
5.
Install elbow (6) on thermal relief valve (4).
6.
Install elbow (3) on thermal relief valve (4).
7.
Install thermal relief valve (4) on pipe (5) (WP 0489).
8.
Install vent line (2) on elbow (3).
9.
Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect batteries (TM 9-2320-325-14&P)
2.
Close pump house panel A (WP 0539)
END OF TASK
END OF WORK PACKAGE
0259-3/(4 blank)