DRAFT
TM 5-4210-249-13&P-2
0262
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00280
8.
Install wire (9) on stud (10) with locknut (8).
9.
Install hose (6) on primer pump (7) with clamp (5).
10. Install supply line (3) on elbow (4).
11. Install elbow (1) on fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0262-4