DRAFT
TM 5-4210-249-13&P-1
0105
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT02779A
Step 16.
Install test lead set between main wire harness wire 2328 (green) at auto tank fill
controller connector, terminal A and a known good ground. Check for 0 VDC between
pump house power distribution wire harness wire 2325 at relay P1 connector, terminal 1
and a known good ground.
If 22 to 28 VDC are present, install relays in original positions and replace
0105-14