DRAFT
TM 5-4210-249-13&P-1
FIELD LEVEL MAINTENANCE
FOAM NOT DELIVERED WHEN TANK A IS SELECTED (BUMPER TURRET, GROUND SWEEPS, AND
MANUAL METERING CONTROLS)
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References (continued)
Lead Set, Test (WP 0622, Item 21)
WP 0325
Tool Kit, General Mechanic's: Automotive
WP 0337
(WP 0622, Item 27)
WP 0402
WP 0427
Personnel Required
WP 0441
MOS 63B Wheeled vehicle mechanic (2)
WP 0443
WP 0455
References
WP 0459
TM 9-2320-325-14&P
WP 0463
WP 0499
WP 0539
WP 0540
WP 0550
WP 0567
WP 0282
WP 0284
Equipment Conditions
WP 0308
WP 0311
Engine OFF (TM 9-2320-347-10)
WP 0315
Wheels chocked (TM 9-2320-347-10)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
FOAM NOT DELIVERED WHEN TANK A IS SELECTED (BUMPER TURRET, GROUND SWEEPS, AND
MANUAL METERING CONTROLS)
0095-1