• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CYLINDER HEAD REMOVAL/INSTALLATION - Continued
CYLINDER HEAD REPAIR

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
img
TM 5-4210-233-14&P-2
6-13. CYLINDER HEAD REMOVAL/INSTALLATION - Continued
NOTE
Left and right banks are different. Left bank has
three screws. Right bank has only two screws.
Bracket shown being installed on left bank.
(16)
Install two screws (30), !ockwashers (31), and hose clamp (32). Tighten screws to 20 to 25 lb-ft
(27 to 34 N-m).
(17)
Install bracket (33), screw (34), and lockwasher (35).
(18)
Install two screws (36), lockwashers (37), and washers (38). Tighten screws to 20 to 25 lb-ft
(27 to 34 N.m).
d. Follow-on Maintenance.
(1)
Install exhaust manifolds (see para 5-24).
(2)
Install rocker covers (see para 4-140).
(3)
Install thermostat housings (see para 4-137).
(4)
Install air cleaner air hoses (see para 4-128).
(5)
Install engine coolant (see para 5-31).
6-86


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.