• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER TAKE OFF (PTO) SOLENOID AND PRESSURE SWITCH REPLACEMENT - Continued
CREW CAB INSULATION REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 4 Page Navigation
  211    212    213    214    215  216  217    218    219    220    221  
img
. . . .
DRAFT
TM 5-4210-249-13&P-4
0603
FIELD LEVEL MAINTENANCE
CREW CAB INSULATION REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanic's: Automotive
Water pump engine OFF (WP 0022)
(WP 0622, Item 27)
Engine OFF (if required) (TM 9-2320-347-10)
Wheels chocked (if required) (TM 9-2320-347-10)
Materials/Parts
SCBA seat removed (for rear cab insulation only)
Mineral Spirits (WP 0625, Item 32)
(WP 0497)
Pump operator's platform unstowed (for center
References
front cab insulation only) (WP 0016)
WP 0615, Fig. 180
REMOVAL
TFFT01094
NOTE
Remove only insulation necessary to perform specific replacement.
All insulation is removed and installed the same way.
1.
Remove passenger side rear cab insulation (1), (2), and (3) from crew cab (4).
2.
Remove passenger center rear cab insulation (5), (6), (7), and (8) from crew cab (4).
3.
Remove driver center rear cab insulation (9), (10), (11), and (12) from crew cab (4).
4.
Remove driver side rear cab insulation (13), (14), and (15) from crew cab (4).
0603-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.