• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER TAKE OFF (PTO) PUMP REPLACEMENT - Continued
POWER TAKE OFF (PTO) SOLENOID AND PRESSURE SWITCH REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 4 Page Navigation
  208    209    210    211    212  213  214    215    216    217    218  
img
. . . . .
DRAFT
TM 5-4210-249-13&P-4
0602
FIELD LEVEL MAINTENANCE
POWER TAKE OFF (PTO) SOLENOID AND PRESSURE SWITCH REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0615, Fig. 179
(WP 0622, Item 27)
Equipment Conditions
Materials/Parts
Water pump engine OFF (WP 0041)
Compound, Sealing, Pipe
Batteries disconnected (TM 9-2320-325-14&P)
Thread (WP 0625, Item 51)
Left splash guard
Tags, Identification (WP 0625, Item 51)
removed (TM 9-2320-325-14&P)
Lockwasher (2)
Preformed Packing (3)
REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00997
NOTE
Tag and mark connectors and hoses prior to removal to ensure proper installation.
1.
Disconnect two connectors (1) and (2).
2.
Remove two hoses (3) and (4) from tee (5).
3.
Remove hose (6) from elbow (7).
4.
Remove hose (8) from fitting (9).
0602-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.