DRAFT
TM 5-4210-249-13&P-3
0426
INSTALLATION
TFFT01319
NOTE
Both shutoff control valve diode packs are installed the same way.
1.
Install diode (3) on diode connector (2).
2.
Install cover (1) on diode connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
END OF TASK
END OF WORK PACKAGE
0426-2