DRAFT
TM 5-4210-249-13&P-3
0424
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT04697
NOTE
Exhaust fitting must be adjusted in order to slow the rate of roof turret valve closure.
Proper rate of closure is three to five seconds.
11. Loosen jamnut (25) and screw in needle (26) on exhaust fitting (24).
12. Back needle (26) 1 and 1/2 turns.
13. Connect batteries (TM 9-2320-325-14&P).
14. Start engine (TM 9-2320-347-10).
15. Operate roof turret (WP 0036).
NOTE
Adjusting needle valve clockwise allows valve to close faster.
16. Adjust needle (26) until roof turret valve closure is between three to five seconds.
17. Stop engine (TM 9-2320-347-10).
18. Tighten jamnut (25) on needle (26) and exhaust fitting (24).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Stow roof turret control handle (WP 0036)
2.
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0424-6