• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROOF TURRET CONTROL VALVE REPLACEMENT - Continued
SHORELINE INLET RECEPTACLE REPLACEMENT

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  430    431    432    433    434  435  436    437    438    439    440  
img
DRAFT
TM 5-4210-249-13&P-3
0424
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT04697
NOTE
Exhaust fitting must be adjusted in order to slow the rate of roof turret valve closure.
Proper rate of closure is three to five seconds.
11. Loosen jamnut (25) and screw in needle (26) on exhaust fitting (24).
12. Back needle (26) 1 and 1/2 turns.
13. Connect batteries (TM 9-2320-325-14&P).
14. Start engine (TM 9-2320-347-10).
15. Operate roof turret (WP 0036).
NOTE
Adjusting needle valve clockwise allows valve to close faster.
16. Adjust needle (26) until roof turret valve closure is between three to five seconds.
17. Stop engine (TM 9-2320-347-10).
18. Tighten jamnut (25) on needle (26) and exhaust fitting (24).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Stow roof turret control handle (WP 0036)
2.
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0424-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.