DRAFT
TM 5-4210-249-13&P-3
0332
INSTALLATION
TFFT00376
1.
Install pressure governor control (2) on pump operator's panel (5) with four washers (4) and screws (3).
2.
Connect two connectors (1) on pressure governor control (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0332-2