• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP OPERATOR'S PANEL MOMENTARY TOGGLE SWITCH REPLACEMENT
PUMP OPERATOR'S PANEL OVERHEAT TEST BUTTON

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  129    130    131    132    133  134  135    136    137    138    139  
img
.
DRAFT
TM 5-4210-249-13&P-3
0330
INSTALLATION
TFFT00598
NOTE
Pump engine, tank-to-pump, pump cooler, foam tank, and foam system monetary toggle
switches are installed the same way.
Pump cooler momentary switch has six wires.
Install momentary toggle switch as noted prior to removal.
1.
Install pump engine momentary toggle switch (3) on pump operator's panel (6) with washer (5) and nut (4).
2.
Install three wires (2) on pump engine momentary toggle switch (3) with three screws (1).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
WARNING
ICON 30, 44, 27
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful
vapors, and are harmful to skin and clothing. To avoid injury or death, keep away
from open fire and use in well-ventilated area. If adhesive, solvent, or sealing
compound gets on skin or clothing, wash immediately with soap and water.
3.
Apply electrical sealant to ends of three wires (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0330-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.