DRAFT
TM 5-4210-249-13&P-3
0329
INSTALLATION
TFFT00597
1.
Install cable (3) on pump operator's panel (7) with two washers (5) and (6) and nuts (1) and (4).
2.
Hold nut (1) and install handle (2) on cable (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0329-2