DRAFT
TM 5-4210-249-13&P-3
0301
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01669
19. Position wire (9) in control box (15) and tighten strain relief (14).
20. Install four wires (12), (11), (10), and (9) on stud (13) with washer (8), lockwasher (7), and nut (6).
21. Install two wires (5) on main shutoff control (3) with two screws (4).
22. Install plastic cover (2) on main shutoff control (3) with screw (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0301-17/(18 blank)