• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WATER TANK HEATER CONTROL BOX REPLACEMENT - Continued
WATER TANK HEATER CONTROL BOX REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  24    25    26    27    28  29  30    31    32    33    34  
img
DRAFT
TM 5-4210-249-13&P-3
0301
MAIN SHUTOFF CONTROL REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01663
NOTE
After opening water tank heater control box door, tag and mark wires prior to removal to
ensure proper installation.
Remove cable ties as required.
1.
Remove two screws (1) and plastic guards (2) from main shutoff control (3).
2.
Loosen two screws (4) and remove wires (5) from main shutoff control (3).
3.
Loosen two screws (6) and remove four wires (7) from main shutoff control (3).
4.
Remove four screws (8) and main shutoff control (3) from mounting plate (9).
END OF TASK
MAIN SHUTOFF CONTROL INSTALLATION
NOTE
Install cable ties as required.
1.
Install main shutoff control (3) on mounting plate (9) with four screws (8).
2.
Install four wires (7) on main shutoff control (3) and tighten two screws (6).
3.
Install two wires (5) on main shutoff control (3) and tighten two screws (4).
4.
Install two plastic guards (2) on main shutoff control (3) with two screws (1).
END OF TASK
0301-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.