DRAFT
TM 5-4210-249-13&P-2
0267
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00269
8.
Remove hose (19) from elbow (20).
9.
Remove line (21) from elbow (22).
TFFT01974
10. Remove two locknuts (23), cradle (24), and U-bolt (25) from bracket (13) and primer valve (26). Discard
locknuts.
11. Remove two locknuts (27), cable (28), cradle (29), U-bolt (30), and primer valve (26) from bracket (13).
Discard locknuts.
12. Remove elbow (18) from primer valve (26).
13. Remove tee (31) and nipple (32) from primer valve (26).
14. Remove elbow (22) from fitting (33).
15. Remove elbow (20), nipple (32), and fitting (33) from tee (31).
16. Remove four locknuts (34), two cradles (35), U-bolts (36), and bracket (13) from pipe (37). Discard locknuts.
END OF TASK
0267-3