DRAFT
TM 5-4210-249-13&P-2
0224
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00903A
4.
Install hose (4) on charge air cooler (5) and intake tubing (6) with two clamps (3).
5.
Install ducting (2) on charge air ducts with two clamps (1).
NOTE
Use the suggested tension setting for initial tensioning. When belt is installed, run water
pump engine under load for 15 minutes, shut down and readjust belt tension.
Belt tension has a range of +/- 11 lb-ft (49 N).
6.
Start water pump engine and run under load for 15 minutes.
7.
Shut down engine and readjust alternator drive belt (12) tension to 67 lb-ft (298 N), as indicated by belt
tensioner gauge.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install passenger side crew cab access panel (WP 0499)
2.
Install pump house panel O (WP 0540)
END OF TASK
END OF WORK PACKAGE
0224-3/(4 blank)