DRAFT
TM 5-4210-249-13&P-2
FIELD LEVEL MAINTENANCE
CREW CAB AIR CONDITIONER COMPRESSOR AND MOTOR ASSEMBLY REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's: Automotive
MOS 63B, Wheeled vehicle mechanic (2)
(WP 0622, Item 27)
References
Materials/Parts
TM 9-2320-325-14&P
Tags, Identification (WP 0625, Item 51)
Bork Insulation Tape (WP 0625, Item 10)
WP 0614, Fig. 5
Preformed Packing (1)
Equipment Conditions
Preformed Packing (1)
Crew cab bench seat and access panel
Lockwasher (4)
removed (WP 0501)
Lockwasher (5)
Crew cab air conditioner coolant
Locknuts (4)
Lockwasher (4)
Lockwasher (4)
REMOVAL
TFFT01822
NOTE
To remove belt guard and compressor, mounting plate with compressor and motor must
be removed from crew cab floor as an assembly.
Tag and mark connectors, wires, and hoses prior to removal to ensure proper installation.
1.
Disconnect connector (1).
2.
Remove insulation tape (2) from hose (3).
3.
Remove two hoses (3) and (4) and preformed packings (5) and (6) from air conditioner compressor (7).
Discard preformed packings.
0210-1