DRAFT
TM 5-4210-249-13&P-2
0209
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00843
21. Install hose (4) on hose (3).
NOTE
Perform Step (21) to install heater hose on left side of engine.
22. Install hose (3) on shutoff valve (1) with hose clamp (2).
23. Open shutoff valve (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill engine coolant (cooling system servicing) (TM 9-2320-325-14&P)
2.
Install crew cab bench seat and access panel (WP 0501)
END OF TASK
END OF WORK PACKAGE
0209-8