• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP AND PLUMBING BLOW-OUT PROCEDURES - Continued
PUMP AND PLUMBING BLOW-OUT PROCEDURES - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  189    190    191    192    193  194  195    196    197    198    199  
img
DRAFT
TM 5-4210-249-13&P-1
0044
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00712P
23. Let pressure build up to 50 psi (345 kPa) on pump PRESSURE gauge (18). Put GROUND SWEEPS
switch (22) in on position. Indicator light (23) will illuminate.
24. Let pressure drop to zero. Put GROUND SWEEPS switch (22) in off position. Check that indicator light (23)
goes out.
25. Repeat Steps (23) and (24).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02000P
26. Let pressure build up to 50 psi (345 kPa) on pump PRESSURE gauge (18). Put TANK TO PUMP switch (24)
in open position. Indicator light (25) will illuminate.
27. Let pressure drop to zero. Put TANK TO PUMP switch (24) in closed position. Check that indicator light (25)
goes out.
28. Repeat Steps (26) and (27).
0044-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.