TM 5-4210-249-13&P-1
OPERATOR MAINTENANCE
PUMP AND PLUMBING BLOW-OUT PROCEDURES
NOTE
This procedure is to be used when preparing the TFFT for storage and shipment or post
operation in cold environment.
1.
Complete mission.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
WARNING
ICON 72
Make sure truck is parked in a location where personnel and other equipment will
be protected from water spraying out of the discharges and drains.
2.
Position truck in a suitable location to drain and spray out remaining water.
3.
Apply parking brake (TM 9-2320-347-10).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -