• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP AND PLUMBING BLOW-OUT PROCEDURES - Continued
PUMP AND PLUMBING BLOW-OUT PROCEDURES - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  190    191    192    193    194  195  196    197    198    199    200  
img
DRAFT
TM 5-4210-249-13&P-1
0044
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00713P
29. Remove cap (26) from NO. 1 DRIVER SIDE DISCHARGE (27).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00714P
30. Let pressure build up to 50 psi (345 kPa) on PUMP DISCHARGE gauge (13). Put NO. 1 DRIVER SIDE
DISCHARGE valve control (28) to ON position. Indicator light (29) will illuminate.
31. Let pressure drop to zero. Put NO. 1 DRIVER SIDE DISCHARGE valve control (28) in CLOSE position.
Indicator light (30) will illuminate.
32. Repeat Steps (30) and (31).
33. Install cap (26) on NO. 1 DRIVER SIDE DISCHARGE (27).
34. Repeat Steps (29) through (33) for NO. 2, NO. 3, and NO. 4 SIDE DISCHARGES.
0044-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.