• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR STORAGE OR SHIPMENT - Continued
PUMP AND PLUMBING BLOW-OUT PROCEDURES

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  183    184    185    186    187  188  189    190    191    192    193  
img
.
DRAFT
TM 5-4210-249-13&P-1
0043
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT2241
50. Install caps (1) on NO. 1 DRIVER SIDE DISCHARGE (2), NO. 2 DRIVER SIDE DISCHARGE (3), NO. 3
PASSENGER SIDE DISCHARGE (4), and NO. 4 PASSENGER SIDE DISCHARGE (5).
51. Install cap (6) on main inlet (7).
52. Install cap (8) on PASSENGER SIDE AUX. INLET (9).
53. Install cap (10) on DIRECT TANK FILL inlet (11).
54. Remove driver side crew cab access steps (WP 0514) and stow in crew cab.
END OF TASK
PREPARATION FOR SHIPMENT
1.
Perform Pump and Plumbing Blow-Out Procedures if required (WP 0044).
2.
Report all deficiencies to Supervisor.
3.
Drain all air tanks (TM 9-2320-347-10).
END OF TASK
END OF WORK PACKAGE
0043-13/(14 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.