DRAFT
TM 5-4210-249-13&P-1
OPERATOR MAINTENANCE
CORD REEL OPERATION
STARTING CORD REEL OPERATION
TFFT2262
1.
Put GENERATOR PTO switch (1) to on position. Indicator light (2) will illuminate.
2.
3.
4.
Put breakers 1 and 3 (3) and 2 and 4 (4) to ON position.
5.
Remove light box (5) from bracket (6).
6.
Pull light box (5) to required location.
7.
Complete mission.
END OF TASK
0037-1