DRAFT
TM 5-4210-249-13&P-1
0036
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02216
WARNING
ICON 72
Keep a firm grip on roof turret control handle when roof turret is discharging water.
Failure to comply may result in injury to personnel.
NOTE
Pulling handle down will raise roof turret nozzle. Pushing handle up will lower roof turret
nozzle. Pushing handle to left will move roof turret to right. Pushing handle right will move
roof turret to left.
4.
With a firm grip on roof turret control handle (5), push and release agent discharge button (6) on roof turret
control handle (5) to engage roof turret.
5.
Make sure indicator light (7) illuminates on roof turret control handle (5).
6.
Complete mission.
7.
Push and release agent discharge button (6) on roof turret control handle (5) to disengage roof turret.
8.
Indicator light (7) will go out on roof turret control handle (5).
9.
Return roof turret to center position.
10. Push up on roof turret control handle (5).
11. Secure knurled rod (3) on handle yoke and drive socket (2).
12. Install pin (1) on handle yoke and drive socket (2).
END OF TASK
END OF WORK PACKAGE
0036-2