• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TORQUE CONVERTER HOUSING - Continued
TORQUE CONVERTER HOUSING - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  276    277    278    279    280  281  282    283    284    285    286  
img
.
TM 5-4210-233-14&P-2
6-51. TORQUE CONVERTER HOUSING - Continued
d. Assembly.
NOTE
Install  new  seal
and
gasket
when
assembling unit.
(1)
Install bearing (1) in ground sleeve bore (2)
using bearing installer (Appendix B, Section III,
Item 64).
(2)
Set torque converter housing
(3) on wooden blocks.
(3)
Install gasket (4) on torque converter housing (3).
(4)
Align holes and install front support assembly (5).
(5)
Install three screws (6) across from support
assembly (5).
(6)
Install 15 screws (7) around outer edge of front
support assembly (5).
(7)
Install screw (8).
(8)
Torque three screws (6), 15 screws (7), and
screw (8) to 35 to 45 Ib-ft (47 to 61 Nm).
(9)
Install main pressure regulator valve (9) small
end first.
(10) Install main pressure regulator valve spring (10)
and valve stop (11).
(11) Install retainer washer (12) on main pressure
regulator valve spring (10).
(12) Install retaining ring (13) while other person
pushes retainer washer (12).
6-283


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.