• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TORQUE CONVERTER PUMP - Continued
TORQUE CONVERTER PUMP - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  268    269    270    271    272  273  274    275    276    277    278  
img
.
TM 5-4210-233-14&P-2
6.50. TORQUE CONVERTER PUMP - Continued
e. Installation.
NOTE
Keep new seal ring sealed in package
until ready to use so seal ring does not
change shape.
(1)
Roll seal ring (1) to one-half length and hold
for at least 10 seconds.
(2)
Install seal ring (1) in groove (2).
(3)
Install pump (3) in torque converter housing (4)
(4)
Install bearing installer tool (Appendix B, Section
111, Item 61) around ground sleeve (5) and on
bearing (6).
6-275


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.