• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FLYWHEEL ASSEMBLY - Continued
TORQUE CONVERTER STATOR - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  261    262    263    264    265  266  267    268    269    270    271  
img
. . . . . .
TM 5-4210-233-14&P-2
6-49. TORQUE CONVERTER STATOR
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
TOOLS REQUIRED
MATERIALS REQUIRED
Tool Kit, General Mechanics, Automotive
Oil, Lubricating (Item 10, Appendix E)
(Appendix B, Section III, Item 1)
Solvent, Dry Cleaning (Item 3, Appendix E)
Shop Equipment, Automotive
EQUIPMENT CONDITION
Maintenance and Repair
Flywheel Assembly Removed (see para 6-48.)
(Appendix B, Section III, Item 4)
Stator Roller Holder (Appendix B, Section III, Item 60)
NOTE
Twist stator counterclockwise and away from torque converter pump when
removing stator from shaft.
Bearings and springs may fall out when stator is removed.
a. Removal. Remove stator (1) from shaft (2).
b. Disassembly.
(1)
Hold rim of stator (1) on work surface.
(2)
Turning roller race (2) clockwise, slowly remove roller race from stator (1).
(3)
Remove 1 0 roller springs (3) and 10 rollers (4) from stator (1).
(4)
Remove roller bearing (5) and thrust bearing race (6) from stator (1).
6-268


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.