DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
PUMP HOUSE POWER DISTRIBUTION WIRE HARNESS AND BLOCK REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Materials/Parts (continued)
Tool Kit, General Mechanic's: Automotive
Lockwasher (2)
Lockwasher (2)
(WP 0622, Item 27)
References
Materials/Parts
WP 0615, Fig. 94
Adhesive, Sealant, Silicone RTV
(WP 0625, Item 5)
Equipment Conditions
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
REMOVAL
TFFT03055
NOTE
Tag and mark wires prior to removal to ensure proper installation.
Remove cable ties as required.
1.
Remove nut (1), lockwasher (2), and wire 1640 (3) from pass-through terminal block (4). Discard lockwasher.
2.
Remove nut (5), lockwasher (6), and five wires 1138 (7) from pass-through terminal block (8). Discard
lockwasher.
0457-1